Kulara Water off-grid bottling facility is equipped with a on-site 650kW power plant and a 896kWh battery system.
This hybrid system of solar energy and battery storage was installed in Q1 2022 to ensure that the facility is provided with energy continuously.
The site is off-grid: the battery is used for grid forming, and the diesel generators in grid following. If the state of charge of the battery drops below a certain threshold, the diesel generators are called to supply the load.
The site can work also if the battery is in maintenance, by switching the generators to grid forming mode.
Elum Energy ePowerControl MC eases the solar battery integration with the existing infrastructure and maximizes the solar penetration on this site.