Solar, Battery, Diesel Integration of Islanded 4 Star Hotel in Malaysia

South Asia
C&I
180 kWp
Solar, Battery, Diesel Integration of Islanded 4 Star Hotel in Malaysia Image 1

Application
Solar, battery, diesel integration

The Context

During off-season, the system relies solely on PV + Battery. Genests are turned off in order to reduce fuel consumption, leading to:
– diminution of noise pollution
– reduction of carbon footprint
– easier logistics, as bringing fuel and genset-related equipment is a challenge for remote areas.

During peak-season the gensets become grid-forming in addition to the PV and battery system, which are switched to following mode, to match the increase in energy consumption.

ePowerControl MC eases the solar – diesel – battery integration and maximizes the solar penetration on this site, which represents about 30% of the energy need.

  • Layout:
    PV – 180 kWp
  • BESS: 120 kWh
  • Genset – 460 kVA 
    Off grid 
Taking care of your solar installation could be our next challenge

Other Use Cases