Homepage > References > Maximizing Solar Penetration & Genset Efficiency in Yemen


Application
Injection control on the Enedis HTA network
The context
- Product: ePowerControl PPC + SCADA
A Solar/BESS plant has been installed on Hadiboh and Qalansiyah sites in Socotra Island. 39 Huawei 60 KTL inverters with smartlogger have been installed on the site.
ePowerControl PPC allows high penetration of solar on legacy thermal plants of two islanded towns in the desert.
ePowerControl PPC assures minimum genset loading while maintaining maximum solar penetration.
- Layout:
Hadibu: 2.2 MWp
Inverters: 32 x Huawei 60KTL
BESS: 1 MWh
Gensets: 4.5 MVAQalansiya: 800 kWc
Inverters: 7 x Huawei 60KTL
BESS: 320 kWh
Gensets: 2.5 MVA
Taking care of your solar installation could be our next challenge
Other use cases

France
Utility Scale
5,52 MWp
Grid Code Compliance for PV Plant with PPC and SCADA in France
This project is an extension of an existing PV plant in Villefranche connected to the Enedis HTA grid. As the PV site expands, the extension must adhere to grid code regulations and adhere to monitoring and control constraints set by the Total Flex aggregator exclusively for the extension.

France
Utility Scale
12.2 MWp
Grid Compliance for a Utility Scale PV Plant in France
The Logelbach solar farm, built on a former landfill site, consists of 21,384 photovoltaic panels and is expected to generate enough power to cover the annual demand of approximately 6,000 people. It will also help offset around 2,545 tonnes of CO2 annually.

LATAM
Utility Scale
4MW / 8 MWh
BESS Project Optimizes Peak Shaving for a Mine in Peru
La Poderosa Mine project is first Battery Energy Storage System (BESS) for peak shaving in Peru. The primary aim is to optimize electricity usage by strategically charging batteries during low-demand periods and discharging them during peak hours within the National Interconnected System.

MENA
Utility Scale
2.2 MWp
Maximizing Solar Penetration & Genset Efficiency in Yemen
A Solar/BESS plant has been installed on Hadiboh and Qalansiyah sites in Socotra Island. 39 Huawei 60 KTL inverters with smartlogger have been installed on the site.

SSA
Microgrids
700 kWp
Battery Storage Integration of Capitec Bank
South Africa's largest retail and digital bank utilizes solar power to reduce grid dependency, cut energy expenses, and function autonomously during power outages, supported by Elum ePowerControl MC for enhanced system reliability and cost optimization across two operational modes.

South Asia
C&I
415.8 kWp
Hybrid Solar Power Plant of Lubi Island Resort
ePowerControl HFS at Lubi Plantation Resort in the Philippines saves 20% on fuel monthly by prioritizing solar power, reducing carbon emissions by 251 metric tons annually and supplying 60% of the resort's energy needs.