Accueil > References > Solar diesel integration of Rainforest resort in Igatpuri, India
Solar Diesel Integration of a Rainforest Resort
South Asia
C&I
140 kWp

Solar diesel integration
The context
- Product: ePowerControl SD
Elum Energy provided ePowerControl SD for a rainforest resort in Igatpuri, India.
This is a grid-tied project of 140 kW PV Solar with 1 x 125 kVA diesel genset backup. The primary energy source is the grid.
When the grid is on, the client requested that the solar system work is compliant with the local grid requirements. When the grid is off, ePowerControl SD will reduce the inverter output and allow minimum genset loading to maximise solar penetration without harming the genset.
- Layout:
PV: 140 kWp - Gensets: 125 kVA
- Inverters: 2 x 70 kW Growatt
Gensets: 1 x 125 kVA Goel Green
Taking care of your solar installation could be our next challenge with us?
Other use cases

Europe
C&I
35 kWp
EV Charging Station in France
Elum Energy provided an energy management system (EMS) for the KARRGREEN refueling station that offers two low-emission fuels: Biogas and electricity.

South Asia
C&I
4,7 MWp
Zero export with multiple points of injection of an Industrial Site in Malaysia
ePowerControl ZE ensures zero grid export and precise power factor control in a Malaysian grid-tied project with ERS Energy.

Europe
C&I
Zero Export on 3 shopping centres in France
ePowerControl ZE manages solar production for three shopping centers, promoting self-consumption and reducing grid reliance in their ecological transition.

South Asia
C&I
765 kWp
Zero export of a processing plant in the Philippines
ePowerControl ZE ensures zero grid export in a grid-tied project at a processing plant in Pampanga, Philippines.

Europe
EV Charging
25 kWp
Zero export and EV charging in Guadeloupe
ePowerControl EV optimizes solar energy use and EV charging at a Guadeloupe supermarket, reducing energy waste and promoting sustainability.

SSA
Utility Scale
4 MWp
Utility scale Solar / BESS / Genset plant in Comoros
ePowerControl PPC seamlessly manages BESS synchronization and operational transitions in this solar and battery plant, ensuring efficient operation in various modes.